{"id":266011,"date":"2026-08-26T15:38:17","date_gmt":"2026-08-26T15:38:17","guid":{"rendered":"https:\/\/ibs-ksa.com\/?post_type=portfolio&#038;p=266011"},"modified":"2026-08-26T15:38:17","modified_gmt":"2026-08-26T15:38:17","slug":"king-fahd-university-of-petroleum-and-minerals-kfupm-project","status":"publish","type":"portfolio","link":"https:\/\/ibs-ksa.com\/ar\/portfolio\/king-fahd-university-of-petroleum-and-minerals-kfupm-project\/","title":{"rendered":"\u0645\u0634\u0631\u0648\u0639 \u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u0645\u0644\u0643 \u0641\u0647\u062f \u0644\u0644\u0628\u062a\u0631\u0648\u0644 \u0648\u0627\u0644\u0645\u0639\u0627\u062f\u0646 (KFUPM)"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"266011\" class=\"elementor elementor-266011\">\n\t\t\t\t<div class=\"wd-negative-gap elementor-element elementor-element-a1f0c01 e-flex e-con-boxed e-con e-parent\" data-id=\"a1f0c01\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a1f0w01 elementor-widget elementor-widget-wd_text_block\" data-id=\"a1f0w01\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left\">\n\t\t\t\n\t\t\t<p>\u0646\u0641\u0630\u062a \u0634\u0631\u0643\u0629 IBS - Integrated Building Solutions \u0628\u0646\u062c\u0627\u062d \u0645\u0634\u0631\u0648\u0639 <strong>supply, installation, testing and commissioning of a central solar water heating system<\/strong> \u0644\u0640 <strong>\u0645\u0634\u0631\u0648\u0639 \u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u0645\u0644\u0643 \u0641\u0647\u062f \u0644\u0644\u0628\u062a\u0631\u0648\u0644 \u0648\u0627\u0644\u0645\u0639\u0627\u062f\u0646 (KFUPM)<\/strong>. The facility required a dependable, high-capacity hot water supply able to meet continuous daily demand across a large institutional campus, while reducing electricity consumption and long-term operating costs.<\/p><p>The system was delivered as a complete rooftop plant \u2014 solar collection, insulated storage, and automated control \u2014 engineered for consistent hot water availability and long-term operational reliability.<\/p><h3><strong>\u0646\u0637\u0627\u0642 \u0639\u0645\u0644 IBS<\/strong><\/h3><p>\u0643\u0627\u0646\u062a IBS \u0645\u0633\u0624\u0648\u0644\u0629 \u0639\u0646:<\/p><ul><li><p>Supplying and installing a complete solar water heating system<\/p><\/li><li><p>Installing flat-plate solar collector arrays on concrete bases at roof level, set at a uniform tilt angle for maximum year-round solar gain<\/p><\/li><li><p>Supplying and installing insulated hot water storage and heating tanks<\/p><\/li><li><p>Fabricating and installing fully insulated interconnecting pipework, complete with expansion vessels and safety valves<\/p><\/li><li><p>Supplying and installing electrical control panels for automatic operation of the heating cycle and circulation pumps<\/p><\/li><li><p>Integration with the facility's plumbing and utility infrastructure<\/p><\/li><li><p>Testing, commissioning and handover of the complete system<\/p><\/li><\/ul>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"wd-negative-gap elementor-element elementor-element-a1f0c02 e-grid e-con-boxed e-con e-parent\" data-id=\"a1f0c02\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a1f0w02 elementor-widget elementor-widget-wd_text_block\" data-id=\"a1f0w02\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left\">\n\t\t\t\n\t\t\t<h3><strong>\u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0627\u0644\u0645\u0648\u0631\u062f\u0629<\/strong><\/h3><p>The project utilized water heating equipment from <strong>\u0623\u0648 \u0634\u0648\u0641\u0627\u062c<\/strong>, including insulated hot water storage and heating tanks installed at rooftop plant level, together with flat-plate solar collector arrays selected for durability and sustained performance under continuous institutional demand.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a1f0i01 elementor-widget elementor-widget-wd_image_or_svg\" data-id=\"a1f0i01\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_image_or_svg.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\n\t\t<div class=\"wd-image text-center\">\n\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"648\" height=\"308\" src=\"https:\/\/ibs-ksa.com\/wp-content\/uploads\/2026\/08\/kfupm-king-fahd-university-petroleum-minerals-project.jpg\" class=\"attachment-full size-full\" alt=\"\u062d\u0631\u0645 \u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u0645\u0644\u0643 \u0641\u0647\u062f \u0644\u0644\u0628\u062a\u0631\u0648\u0644 \u0648\u0627\u0644\u0645\u0639\u0627\u062f\u0646 (KFUPM)\u060c \u0645\u0648\u0642\u0639 \u0645\u0634\u0631\u0648\u0639 \u062a\u0633\u062e\u064a\u0646 \u0627\u0644\u0645\u064a\u0627\u0647 \u0628\u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0634\u0645\u0633\u064a\u0629 \u0627\u0644\u062a\u0627\u0628\u0639 \u0644\u0645\u0639\u0647\u062f IBS\" srcset=\"https:\/\/ibs-ksa.com\/wp-content\/uploads\/2026\/08\/kfupm-king-fahd-university-petroleum-minerals-project.jpg 648w, https:\/\/ibs-ksa.com\/wp-content\/uploads\/2026\/08\/kfupm-king-fahd-university-petroleum-minerals-project-400x190.jpg 400w, https:\/\/ibs-ksa.com\/wp-content\/uploads\/2026\/08\/kfupm-king-fahd-university-petroleum-minerals-project-18x9.jpg 18w, https:\/\/ibs-ksa.com\/wp-content\/uploads\/2026\/08\/kfupm-king-fahd-university-petroleum-minerals-project-430x204.jpg 430w, https:\/\/ibs-ksa.com\/wp-content\/uploads\/2026\/08\/kfupm-king-fahd-university-petroleum-minerals-project-150x71.jpg 150w\" sizes=\"(max-width: 648px) 100vw, 648px\" \/>\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"wd-negative-gap elementor-element elementor-element-a1f0c03 e-flex e-con-boxed e-con e-parent\" data-id=\"a1f0c03\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a1f0w03 elementor-widget elementor-widget-wd_text_block\" data-id=\"a1f0w03\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left\">\n\t\t\t\n\t\t\t<h3><strong>\u0645\u0632\u0627\u064a\u0627 \u0627\u0644\u0646\u0638\u0627\u0645<\/strong><\/h3><ul><li><p>Solar energy covering a large share of daily hot water demand, reducing electricity consumption and operating costs<\/p><\/li><li><p>High-capacity insulated storage maintaining hot water availability through peak morning demand and after sunset<\/p><\/li><li><p>Automated control panels managing the heating cycle and circulation pumps, with clear operating and fault indication for the facility team<\/p><\/li><li><p>Fully insulated pipework minimising heat loss across the rooftop distribution network<\/p><\/li><li><p>Robust outdoor installation built for continuous service in Saudi rooftop conditions<\/p><\/li><\/ul><h3><strong>\u0642\u064a\u0645\u0629 \u0627\u0644\u0645\u0634\u0631\u0648\u0639<\/strong><\/h3><p>Serving one of the Kingdom's leading engineering institutions, this project demonstrates IBS's capability to deliver complete, sustainable electromechanical systems at institutional scale \u2014 from solar collection through storage to automated control \u2014 executed and commissioned to a single standard of quality.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>IBS executed the supply, installation, testing and commissioning of a central solar water heating system for the King Fahd University of Petroleum and Minerals (KFUPM) Project \u2014 rooftop solar collectors, insulated Eau Chauffage storage and heating tanks, and automated control panels.<\/p>","protected":false},"featured_media":266014,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","project-cat":[154],"class_list":["post-266011","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","project-cat-education"],"_links":{"self":[{"href":"https:\/\/ibs-ksa.com\/ar\/wp-json\/wp\/v2\/portfolio\/266011","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ibs-ksa.com\/ar\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/ibs-ksa.com\/ar\/wp-json\/wp\/v2\/types\/portfolio"}],"replies":[{"embeddable":true,"href":"https:\/\/ibs-ksa.com\/ar\/wp-json\/wp\/v2\/comments?post=266011"}],"version-history":[{"count":4,"href":"https:\/\/ibs-ksa.com\/ar\/wp-json\/wp\/v2\/portfolio\/266011\/revisions"}],"predecessor-version":[{"id":266016,"href":"https:\/\/ibs-ksa.com\/ar\/wp-json\/wp\/v2\/portfolio\/266011\/revisions\/266016"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ibs-ksa.com\/ar\/wp-json\/wp\/v2\/media\/266014"}],"wp:attachment":[{"href":"https:\/\/ibs-ksa.com\/ar\/wp-json\/wp\/v2\/media?parent=266011"}],"wp:term":[{"taxonomy":"project-cat","embeddable":true,"href":"https:\/\/ibs-ksa.com\/ar\/wp-json\/wp\/v2\/project-cat?post=266011"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}