IBS – Integrated Building Solutions successfully delivered the supply and installation of a high-capacity electric water heating system for Makkah Hotel 2, a hospitality project located in the holy city of Makkah.
The system was engineered to meet the high hot water demand associated with continuous guest flow, ensuring reliable performance during peak occupancy seasons.
IBS Scope of Work
IBS scope of work included:
Supply of electric water heating systems
Full system installation
Integration with the hotel’s mechanical and plumbing networks
Testing and commissioning to ensure operational reliability