IBS – Integrated Building Solutions contributed to the Sitten Tower (SAICO Project) through the supply of specialized insulation and sealing materials used within mechanical and HVAC systems for a high-rise commercial development.
The supplied products were selected to meet project technical requirements, ensuring effective insulation performance, secure sealing, and long-term reliability in line with commercial building standards.
IBS Scope of Work
IBS scope of work included:
Supply of insulation and sealing materials for HVAC and mechanical systems
Support of installation works through approved and high-quality products
Compliance with commercial project specifications and technical standards
Contribution to system efficiency and long-term operational performance