IBS – Integrated Building Solutions delivered the supply and installation of an industrial electric water heating system for Zulfi Club Sport, a professional sports facility designed to support training activities, matches, athletes, and operational staff.
The project required a reliable and high-capacity hot water solution to serve locker rooms, showers, and support areas, ensuring continuous performance during daily operations and peak usage periods.
IBS Scope of Work
IBS scope of work included:
Supply of electric water heating systems
Complete on-site installation
Integration with the facility’s mechanical systems
System commissioning and performance verification