IBS – Integrated Building Solutions delivered the supply and installation of an industrial electric water heating system for Zulfi Club Sport, a professional sports facility designed to support training activities, matches, athletes, and operational staff.

The project required a reliable and high-capacity hot water solution to serve locker rooms, showers, and support areas, ensuring continuous performance during daily operations and peak usage periods.

IBS Scope of Work

IBS scope of work included:

  • Supply of electric water heating systems

  • Complete on-site installation

  • Integration with the facility’s mechanical systems

  • System commissioning and performance verification

Products Supplied

The project utilized Eau Chauffage industrial electric water heaters, selected for their durability, efficiency, and suitability for large-scale sports facilities.

Installed Model:

  • ECC 2050-48

System Advantages

  • Stable and continuous hot water supply for sports facilities

  • Designed to meet high-demand usage during training and events

  • Energy-efficient operation with consistent output

  • Robust industrial construction for long-term reliability

  • Low maintenance requirements

Project Value

This project demonstrates IBS’s expertise in delivering dependable electromechanical solutions for sports and athletic facilities. The installation of Eau Chauffage electric water heaters ensures operational efficiency, athlete comfort, and long-term system performance at Zulfi Club Sport.