IBS – Integrated Building Solutions successfully delivered the supply and installation of a high-capacity electric water heating system for Makkah Hotel 2, a hospitality project located in the holy city of Makkah.

The system was engineered to meet the high hot water demand associated with continuous guest flow, ensuring reliable performance during peak occupancy seasons.

IBS Scope of Work

IBS scope of work included:

  • Supply of electric water heating systems

  • Full system installation

  • Integration with the hotel’s mechanical and plumbing networks

  • Testing and commissioning to ensure operational reliability

Products Supplied

The project utilized Eau Chauffage electric water heaters, selected for their durability, efficiency, and suitability for large-scale hotel applications.

Installed Model:

  • ECR 2050-100

System Advantages

  • High-capacity hot water supply suitable for large hotels

  • Consistent performance under continuous operation

  • Energy-efficient operation

  • Robust construction for long-term reliability

  • Minimal maintenance requirements

Project Value

This project reflects IBS’s expertise in delivering dependable electromechanical solutions for hospitality developments in high-demand environments. The installed system ensures uninterrupted hot water availability, supporting guest comfort and operational efficiency at Makkah Hotel 2.