IBS – Integrated Building Solutions delivered the supply and installation of electric water heating systems for the Al Arous Residential Development, covering single-family housing units across Zones A, B, and C.

The project is designed to provide modern, efficient, and reliable hot water solutions that support comfortable living standards for homeowners while ensuring operational efficiency and long-term performance.

IBS Scope of Work

IBS scope of work included:

  • Supply of electric water heaters for single-family residential units

  • System installation and integration within residential infrastructure

  • Testing and commissioning to ensure optimal performance

  • Compliance with residential safety and efficiency standards

Product Supplied

The residential units were equipped with Eau Chauffage electric water heaters, selected for their compact design, reliability, and suitability for single-family applications.

Installed Model:

  • ECR-100L

System Advantages

  • Reliable and consistent hot water supply

  • Compact design suitable for residential installations

  • Energy-efficient operation

  • Durable construction with long service life

  • Low maintenance requirements

Project Value

The Al Arous Residential Project reflects IBS’s expertise in delivering scalable and efficient residential water heating solutions, supporting large-scale housing developments with systems that enhance comfort, reliability, and long-term value for homeowners.