IBS – Integrated Building Solutions successfully delivered the supply and installation of electric water heating systems for a three-star hotel project developed under a Design, Build, and Operate model.
The project was designed to meet the operational requirements of hospitality facilities, ensuring reliable hot water availability while maintaining energy efficiency and cost-effective performance throughout daily hotel operations.
IBS Scope of Work
IBS scope of work included:
Supply of electric water heaters for guest rooms and service areas
Installation and system integration
Testing and commissioning to ensure consistent performance
Compliance with hotel operational standards and safety requirements